Everything required for this rooftop project in Wimbledon was provided by Wallbarn.
The client contacted us with some very tight deadlines.
A large green roof was needed to comply with planning rules. They also wanted a paved access area around the green roof and a decked terrace to be laid onto another outdoor space.
As Wallbarn supplies mature M-Tray® plant modules from stock, we were able to respond quickly to the client’s demands. The sedum plants contained within each module are mature and established, and therefore provide an instant green roof.